{"id":558,"date":"2024-08-09T19:22:14","date_gmt":"2024-08-09T19:22:14","guid":{"rendered":"https:\/\/hvhappens.com\/?p=558"},"modified":"2024-08-10T06:57:46","modified_gmt":"2024-08-10T06:57:46","slug":"texas-state-university-systems-board-of-regents-approves-shsu-bowers-stadium-upgrades","status":"publish","type":"post","link":"https:\/\/hvhappens.com\/index.php\/2024\/08\/09\/texas-state-university-systems-board-of-regents-approves-shsu-bowers-stadium-upgrades\/","title":{"rendered":"Texas State University System\u2019s Board of Regents Approves SHSU Bowers Stadium Upgrades"},"content":{"rendered":"\n<p class=\"has-cyan-bluish-gray-color has-text-color has-link-color wp-elements-e0a87cff701f3315f517ad679d1f987b\">By Staff Writer<\/p>\n\n\n\n<p class=\"has-cyan-bluish-gray-color has-text-color has-link-color wp-elements-0b17793c87dbbaad5d69f4b4ffd86b1e\">August 10, 2024<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-4-3 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"TX State University System Board of Regents approved a $60 million upgrade for SHSU\u2019s Bowers Stadium\" width=\"640\" height=\"480\" src=\"https:\/\/www.youtube.com\/embed\/N1qL2FjBza8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>Huntsville, Texas &#8211; Design development documents for the new Bowers Stadium press box and stadium improvements were approved by the Texas State University System Board of Regents at their meeting this week at their quarterly meeting August 8th &amp; 9th.<\/p>\n\n\n\n<p>The stadium project will replace the existing press box with a more modern, five level structure. The building will include updated concessions and restrooms.&nbsp;&nbsp;Luxury suites and a club area with access to outdoor balcony seating will be added.&nbsp;<\/p>\n\n\n\n<p>Page Southerland Page, Incorporated and architecture firm DLR Group were awarded the contract to renovate the Elliott T.&nbsp;Bowers Football Stadium.<\/p>\n\n\n\n<p>The $60 million project will be financed through a combination of bonds and the contributions from donors.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1108\" height=\"791\" data-id=\"559\" src=\"https:\/\/hvhappens.com\/wp-content\/uploads\/2024\/08\/IMG_1927.jpeg\" alt=\"\" class=\"wp-image-559\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1136\" height=\"680\" data-id=\"562\" src=\"https:\/\/hvhappens.com\/wp-content\/uploads\/2024\/08\/IMG_1926.jpeg\" alt=\"\" class=\"wp-image-562\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1097\" height=\"741\" data-id=\"563\" src=\"https:\/\/hvhappens.com\/wp-content\/uploads\/2024\/08\/IMG_1925.jpeg\" alt=\"\" class=\"wp-image-563\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"794\" data-id=\"564\" src=\"https:\/\/hvhappens.com\/wp-content\/uploads\/2024\/08\/IMG_1924.jpeg\" alt=\"\" class=\"wp-image-564\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"524\" data-id=\"565\" src=\"https:\/\/hvhappens.com\/wp-content\/uploads\/2024\/08\/IMG_1923.jpeg\" alt=\"\" class=\"wp-image-565\"\/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>By Staff Writer August 10, 2024 Huntsville, Texas &#8211; Design development documents for the new Bowers Stadium press box and stadium improvements were approved by the Texas State University System Board of Regents at their meeting this week at their quarterly meeting August 8th &amp; 9th. The stadium project will replace the existing press box [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":559,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-558","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/posts\/558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/comments?post=558"}],"version-history":[{"count":2,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/posts\/558\/revisions"}],"predecessor-version":[{"id":566,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/posts\/558\/revisions\/566"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/media\/559"}],"wp:attachment":[{"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/media?parent=558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/categories?post=558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hvhappens.com\/index.php\/wp-json\/wp\/v2\/tags?post=558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}